Production Management
WIP, production tracking and shipment readiness, so you always know where every order stands.
No surprises between order and shipment
Late shipments are rarely caused by one big failure. They come from small delays that nobody reported in time: fabric that arrived late, an approval that was missed, a line that was loaded with the wrong style.
We track the order against a plan from the day it is confirmed, report progress on an agreed schedule, and tell you early when something is slipping, with options for recovery.
Production planning
Capacity is confirmed against your order, and a time-and-action calendar sets out every critical date.
Material readiness
We follow fabric and trims from order to arrival, since everything else depends on them.
WIP tracking
Cutting, sewing, finishing and packing quantities are tracked by style and colour.
Shipment readiness
Inspection, packing and documents are checked so goods are ready when the booking is.
Critical milestones we track
Each milestone has a date in the time-and-action calendar. A missed milestone triggers a conversation immediately.
| Milestone | Why it matters |
|---|---|
| Fabric and trims in the factory | Every later date depends on materials arriving on time and passing inspection |
| Approvals complete | Cutting should not start until fabric, colour and the pre-production sample are approved |
| Cutting started | Confirms actual quantities, fabric consumption and the true start of production |
| Sewing lines loaded | Daily output against plan shows early whether the delivery date is safe |
| Inline inspection | Catches defects while production can still be corrected |
| Finishing and packing | Often the stage where time is lost, so it needs its own date |
| Final inspection | Passes the order for shipment or identifies what has to be fixed first |
| Shipment booking and loading | Aligns cargo-ready date with the booking made by you or your forwarder |
Work-in-progress reports
One page that shows where each style stands.
The WIP report shows, for each style and colour, the order quantity and how much has been cut, sewn, finished and packed. It compares the plan with the actual position, lists any delays with their reasons, and states the action being taken.
Reports are shared on a schedule agreed with you, and more often when an order is at risk.
Early warning, with options
When we see a delay coming, you hear about it early and with a plan.
A problem reported two weeks before the ship date can usually be solved. A problem reported two days before cannot. We aim for the first, and bring options with the problem: more lines or shifts, a split shipment, or a different shipping method for you to decide.
Shipment readiness check
- Final inspection passed, or agreed actions completed
- Cartons marked correctly and packing list matching the goods
- Ratio packs and assortments verified against the order
- Invoice and packing list prepared with the factory
- Cargo-ready date confirmed with your freight forwarder
- Loading checked where required